{"site":"Stroma Tidal Co-operative","now":{"t":1789433764532,"mw":3.76,"h":1.69,"v":2.559,"state":"flood","springs":"neaps","springsIndex":0.081,"nextSlackAt":1789447625312.3726,"nextSlackKind":"high water","kwhSinceMidnight":2965,"midnight":1789426800000,"turbines":[{"id":"T1","name":"Swelkie","mw":0.85,"state":"generating"},{"id":"T2","name":"Merry Men","mw":0.931,"state":"generating"},{"id":"T3","name":"Boars","mw":0.931,"state":"generating"},{"id":"T4","name":"Skerries","mw":1.048,"state":"generating"}],"events":[]},"model":{"M2":{"amp":1.2,"periodH":12.4206012},"S2":{"amp":0.25,"periodH":12},"cutIn":1,"rated":3,"cutOut":4.5,"ratedMW":1.5},"turbines":[{"id":"T1","name":"Swelkie"},{"id":"T2","name":"Merry Men"},{"id":"T3","name":"Boars"},{"id":"T4","name":"Skerries"}],"events":[{"kind":"outage","turbine":2,"start":1788501600000,"end":1788631200000,"factor":0,"label":"Boars off for seal replacement","note":"Planned. Rotor seal on T3 Boars replaced by the dive team over two slack windows. 36 h."},{"kind":"curtailment","turbine":null,"start":1789052400000,"end":1789102800000,"factor":0.4,"label":"Curtailed to 40 % on network instruction","note":"Network operator instruction during the 10 September gale, while the Gills Bay line was on single circuit. 14 h."}],"computeMs":48}